Rubber-free floor installation and maintenance tips
专栏:Construction process
发布日期:2013-11-20
阅读量:1055
收藏:
Rubber-free floor installation and maintenance tips With the further improvement of science and technology and living standards, in addition to quality is the constant pursuit of consumers, env...

Rubber-free floor installation and maintenance tips

        With the further improvement of science and technology and living standards, in addition to quality is the constant pursuit of consumers, environmental protection has become increasingly hot topic, due to the convenience of the installation and maintenance of rubber-free flooring, more importantly, its environmental protection Sex has become a new direction for the global flooring industry.

Bakelite floor installation

First, the floor-free installation of high precision requirements

The gel-free installation of the floor lock has a high requirement for the buckle type design and the precision of the bite, which requires a high quality and processability of the floor substrate to achieve a precise and dense effect.

Second, non-glue flooring moisture treatment

The rubber-free floor must be treated with a tight moisture barrier on the four sides of the floor and around the lock so that after the cut the buckle body and the four sides are tightly sealed, even if there is moisture or accidental flooding, just in time Dealing with products will not be affected. The glue-free installation can increase the construction speed, and also eliminates the need to clean the glue on the floor surface after the construction is completed.

Third, rubber-free floor installation precautions

At present, more than 90% of the floor's problems are caused by poor waterproofing. It should be noted that during the cleaning process, it is inevitable to mop the floor and sprinkle water. Once the water enters the substrate, it will cause damage to the floor.

Fourth, the use of floor glue and performance characteristics

Solvent-free, green products, in line with EU ROHS standards; excellent initial tack and final tack strength; easy construction, economic usage, high coating rate; long open time, long-lasting bonding; suitable for geothermal system base layer.

Fifth, floor glue base treatment

The grass-roots level must be clean and free of debris, smooth and solid, dry and free of cracks. For the excessively water-absorbing base layer, it was treated with a multi-functional water-based interface agent. Rough or uneven bases must be leveled with self-leveling cement. New concrete, mortar layers, etc. must be tested for moisture content, less than 4% before construction can be used, or Hengsheng epoxy moisture-proof primer system for moisture treatment.

Sixth, the use of floor glue

Stir the material evenly before use and use a serrated spatula to evenly apply the coating. Dry the coating for about 5-30 minutes after the sizing (touch the finger to judge the dry condition) to lay the material. After laying the ground material, use a wooden scraper or roller to remove the air and ensure that the adhesive layer is in full contact with the floor material. If necessary, apply heavy weights to avoid joint corners lifting. About 24 hours after the basic curing, about 48 hours after walking on the people.

Seven, the scope of application of floor glue

It is suitable for bonding all kinds of plastic block flooring, floor tiles (below 3.0mm), common coil flooring and carpets and other floor materials on absorbent floors. The glue-free installation can be no longer glued in the case of suspension installation. The implementation of the glue-free installation is achieved by means of some transformations in the manufacturing technology.


上一页:找不到相关信息
下一页:找不到相关信息

在线客服

在线客服
联系方式

服务热线:400 6768 266

邮箱:service@hwap-cn.com